|
Products
|
|
|
Bearings
|
|
|
|
Fluid Power
|
|
|
|
Gearboxes
|
|
|
|
Health & Safety
|
|
|
|
Industrial Automation
|
|
|
|
Maintenance
|
|
|
|
Mechanical PT
|
|
|
|
Motors
|
|
|
|
Seals
|
|
|
|
Tools
|
|
|
|
|
|
The Paper & Packaging industries represent a diverse range of industries ranging
from the actual production of paper through to its use in a wide range of packaging
types. The production of paper presents a number of challenges for Industrial MRO
products not least the amount of moisture created through the pulping, bleaching
and coating processes inherent in its production. This can create conditions which
are hostile for many industrial MRO products, increasing the likelihood of premature
component failure and the risk of unscheduled and expensive production downtime.
|
|
|
|
Brammer can provide technical advice on a wide range of applications which have
specific features designed to help components cope with the demands of the Paper
& Packaging industries. Whether its improved sealing, lubrication or corrosion
resistance we can identify, source and supply the most suitable products for the
job.
|
|
|
We can also offer help and advice with preventative maintenance and if necessary
analysis of any specific applications that are failing prematurely. Using this analysis
will enable us to identify alternative applications designed to provide a long-term
solution and increased component life.
|
|
|
Where component failure has brought production to a halt you can rely on Brammer
to get you the replacement products you need fast. Our state-of the-art National
Distribution Centre in Wolverhampton holds the largest stock of Industrial MRO products
in the UK. Any product can be picked for immediate despatch 24/7, 365 days a year.
A range of direct delivery options means that product can be delivered to the majority
of locations in the UK within 3 to 6 hours.
|
|
|
Brammer can also provide consignment stock at the customer's site or at the
nearest Brammer Sales & Service Centre to ensure that even faster response
times can be provided for specific production-critical items if required.
|
|
|
|
|
|
|